Site Specific Challenge
-
SEPTA Levittown Station
Renovations to the SEPTA Levittown Station is included under SEPTA’s “Catching Up” Capital Improvement Program. The Levittown Station is being transformed from a 1950’s era station into a state of the art intermodal transportation facility; adding modern amenities such as a new station building, high level platforms, pedestrian overpass and reconfigured Fallsington Avenue / Route [...]Click here to read more. -
Gravity Thickener
Gravity Thickener Site Specific Challenge The Location: Philadelphia Northeast Water Pollution Control Plant The Challenge: Construct new 30M dollar Gravity Thickener Facilities consisting of 4 each 80-ft diameter concrete tanks, pumping station, odor control facility, underground valve vault, 4” to 36” ductile iron process pipelines, Fiberglass piping and fans, along with 43 new pumps and [...]Click here to read more. -
W-Hotel
Thomas P. Carney, Inc. is the Structural Concrete Contractor for the new 51-Story, 769,704 s.f. W/Element Hotel high rise, located at 15th & Chestnut Streets, just two blocks from City Hall, in Philadelphia, PA. Thomas P. Carney, Inc. successfully completed the largest continuous concrete pour in Philadelphia’s history. The pour, which consisted of 620 tons [...]Click here to read more.